High-Integrity Fire & Life Safety (72MW Substation)
Scope: Led the design, engineering, and commissioning of Fire & Gas Detection, VESDA, and Fire Suppression systems for KOC’s 72MW Main Intake Substation.
Compliance: Ensured full adherence to NFPA, IEC, and API standards for critical electrical infrastructure.